Bridge Construction - Transport a 400 ton bridge element
2016-07-27 9 Dailymotion
Here transportet ALE Heavylift a 400 ton segment for the new Freybridge on a pontoon, of a river, to the remaining bridge structure. this bridge part was welded together 1.5 kilometres upstream. More on my Channel.